Refurbishment Process

We understand the needs of our customers who require equipment to be in excellent cosmetic and patient-ready condition. Our goal is to recondition equipment to ensure a finished product where it looks and operates “like new.” Gumbo Medical

See The Refurbishment Process Happen

Learn the Refurbishment Process

1. Preliminary Inspection

An initial inspection is performed to determine proper functionality to manufacturer specifications. Any damaged parts and/or missing parts are identified.

2. Disassembly

Equipment is disassembled for sanding, deep cleaning and repair.

3. Cleaning

Equipment is thoroughly washed removing any dirt, grime, and tape residue to sanitize, prep for painting and repair.

4. Repair

If necessary, any damaged and/or missing parts are repaired and/or replaced with OEM replacement parts. Moving parts are lubricated or greased.

5. Painting

Equipment is repainted to remove any chips or scratches to ensure a “like new” cosmetically appealing finished product.

6. Relabeling

Repainted equipment is relabeled with OEM equipment labels.

7. Reassembly

Equipment is reassembled.

8. Final Inspection

Equipment is tested and undergoes a functional and safety inspection by a biomedical technician to ensure the product is performing to manufacturer specifications.d/or missing parts are repaired and/or replaced with OEM replacement parts. Moving parts are lubricated or greased.